Dubai Islands landscaping project
Nakheel / Dubai Holding
Dubai Islands, Dubai, UAE
Construction of soft landscape and irrigation network system
Approx. 40,000 m²
60 days





Creating a landscape on this scale takes more than planting and greenery. It requires careful coordination, reliable irrigation infrastructure and an approach that brings every element together.
At Dubai Islands, Eco Tree Landscaping delivered approximately 40,000 m² of softscape works alongside an extensive irrigation network. The project also incorporated a 50 kW solar-powered irrigation system, bringing landscape development and renewable energy together in one coordinated undertaking.
Use four large statistics in a clean horizontal layout.
| Statistic | Caption |
|---|---|
| 40,000 m² | Landscaped area |
| 42 | Irrigation stations |
| 50 kW | Solar-powered irrigation |
| 60 days | Project delivery |
These are the project’s actual figures, not promotional estimates. PROJECT – Brief
The project combined extensive softscape development with the irrigation infrastructure needed to support it. Eco Tree Landscaping coordinated both workstreams as part of the wider landscape delivery.
Delivering the softscape works across approximately 40,000 m² required coordinated preparation, planting and landscape establishment. The work formed a major part of the overall project, bringing the planned landscape areas together through an organised delivery process.
Supporting the extensive landscaped area was a comprehensive irrigation network comprising 42 irrigation stations. ECO TREE Landscaping coordinated the installation and commissioning of the irrigation infrastructure as an integral part of the wider landscape development.
An extensive landscape requires supporting infrastructure that works as part of the overall development. Eco Tree Landscaping coordinated the installation and commissioning of 42 irrigation stations, integrating a 50 kW solar-powered irrigation system into the project.
This combination of landscape development and renewable-energy-powered irrigation was a defining feature of the project.
Coordinating extensive softscape works with the installation of a substantial irrigation network required careful planning and site management. Through structured execution and coordination between the two workstreams, Eco Tree Landscaping completed the project within the planned 60-day programme.
The integration of solar-powered irrigation also gave the project a distinctive sustainability feature, combining large-scale landscape development with renewable energy.
Creating thoughtful, sustainable landscapes that bring beauty, function, and lasting value to outdoor spaces.
#F-13, Al Marar, 117-595
P.O. Box: 120917
Dubai, United Arab Emirates
Copyright © 2026 Ecotreelandscaping. All Rights Reserved.